صافي الدخل تغيير تاريخ
3i Infrastructure GBP 258M 94M 2025-12
Acciona EUR 277M 249M 2025-12
Aena EUR 329.42M 227.82M 2026-03
Asian Total Return GBP 77.06M 52.07M 2025-12
Centrica GBP 179M 430M 2025-12
E.ON EUR 2.23B 1.41B 2026-03
EDP EUR 377.8M 180.3M 2026-03
Enagas EUR 56.9M 19.41M 2026-03
Enel EUR -1.01B 2.82B 2025-12
ENGIE EUR 749M 2.06B 2025-12
Ferrovial EUR 348M 192M 2025-12
Iberdrola EUR 1.73B 749.7M 2026-03
National Grid GBP 2.62B 2.01B 2026-06
Orsted A/S DKK 2.32B 6.35B 2026-03
Pennon GBP 57.2M 84.8M 2025-12
Redeia Corporacion SA EUR 140.3M 24.5M 2026-03
RWE EUR 20M 811M 2026-03
Severn Trent GBP 88M 53.4M 2025-06
Snam EUR 190M 118M 2025-12
SSE GBP 292.1M 375.2M 2025-12
Terna Rete Elettrica Nazionale EUR 265M 1.3M 2025-09
United Utilities GBP 240M 78.4M 2025-12
Veolia EUR 560M 97M 2025-12
Verbund EUR 269.8M 7.4M 2026-03
Vestas EUR 82M 185M 2026-03
Vinci EUR 3.01B 1.11B 2025-12